Opening in Q1 2025 - Fort McMurray South Waste Processing Facility
In the Heart of the Athabasca Oil Sands Region
The Athabasca oil sands region has been void of comprehensive waste management solutions to serve the needs of energy producers. Oil sands operators from the region often have to ship waste products significant distances to facilities in other regions.
We recognized the important need to reduce transportation costs and greenhouse gas emissions.
Pure Environmental is developing integrated waste management facilities in the heart of the region. These facilities include an Engineered Class II Landfill, Waste Processing Facility and a Geothermal Waste Cavern that will be adjacent to one another. Our Waste Processing Facility will be equipped to accept hydrovac slurries from Brownfield and Greenfield projects along with spill material and contaminated snow.